229 Mountbatten Road, #01-23 Mountbatten Square, Singapore 398007
229 Mountbatten Road, #01-23 Mountbatten Square, Singapore 398007

Engineering Energy Storage Systems

HY had the privilege to partner with various Energy Storage System (ESS) vendors to conduct pilot trials and demonstrations

HY had the privilege to partner with various Energy Storage System (ESS) vendors to conduct pilot trials and demonstrations on the safe use and operations of ESS. The following are some of the projects we have embarked on. 

One of the ongoing projects is the setup of the Energy Storage System by GenPlus to be installed as part of the Floating Living Lab, a research project collaboration between Keppel O&M and EMA.  

At HY, we provide the services to review and engineer the Electrical, Fire and Cooling Systems with the ESS Manufacturer.  This is to ensure that the Electrical, Fire Safety and Cooling Provisions for the ESS meet the requirements of the Authorities, such as EMA, SP Group and SCDF.  This will often require rounds of discussion and consultation with the various stakeholders, certification and verification of the installed system to ensure that they are safely deployed.

We provide Testing and Commissioning services for ESS which includes Power Quality Profiling. 

We provide the services to Model and Simulate the Thermal and Fire effects of ESS, using CAE Tools. This can be useful to understand the worst-case scenarios of ESS deployments.

We are keen to explore more applications and work with partners to join us in this learning journey. 

Contact Er. See Fong (seefong@hy-me.com.sg, 92738900) to discuss more.

 

PSA Pasir Panjang Terminal

2MWh Energy Storage System connected to PSA Pasir Panjang Terminal 6.6kV Network, used for peak shaving and frequency regulation. ESS by DuraPower

Automated Guided Vehicle

Pilot trial to explore use of 2nd-Life batteries retired from existing Automated Guided Vehicle operations.

Keppel Offshore Marine

1.2MWh Energy Storage System setup for at Keppel Offshore Marine connected to the network at 6.6kV.

Energy Storage System

Energy Storage System by EnVision - Tested by GenPlus

Keppel Tower Redevelopment

Keppel Tower Redevelopment, 2022 Energy Storage System used to power Construction Tower Crane. Deployed in Nov 2022, 1 no. 260 kWh

Energy Storage System

A containerized energy storage system FXMS (Fire & Explosion Management System), with three (03) units of Battery Energy Storage System (“BESS”) of 50 kW @ NTU

Tesla Powerpack setup

2 Sets of Tesla Powerpack setup as part of MicroGrid at Kranji NSRCC

Battery Failure Case

Various scenario studies of Battery internal cell failure

Simulation of Battery

Simulation of Battery internal cell failure using Cradle by Hexagon